Assignment the final report on the ewb project after a


Assignment: The Final Report on the EWB project

After a project is completed, a final report has to be provided to the client (EGB100 Ltd). This report should be very detailed and accompanied with figures, tables and charts as appropriate.

Activity

The group report must build on the individual and group assessments undertaken in the previous weeks. It is acceptable to import text directly from the previous assignments undertaken by the group members (but do not forget to bring the references with that). However, it should not be a simplistic 'cut and paste'. It is essential to ensure that the text is seamlessly integrated and that additional information from your work following those earlier assessments is included.

Scope of the report

Based on the understanding developed by the Group, your report should adhere to the following outline and structure as a minimum (content provided in italics):

  • Executive Summary - This is to be succinct, but nevertheless comprehensive summary (1 page)
  • Table of contents, List of figures, List of tables (as appropriate)
  • Introduction - Provide an overview of the project
  • Design Process - Cover the problem the project aims to solve, Outline the alternatives evaluated and the selection process(es) involved
  • Final Designs - Design methodology, any assumptions and concepts adopted should be very clearly stated.
  • Constraints and Limitations
  • Recommendations for future work
  • Team performance - Report on team performance and contributions
  • Conclusion
  • References
  • Appendices

Assignment is about agriculture and climate change in Zambia ( Zambia in Africa).

Attachment:- Assignment.zip

Request for Solution File

Ask an Expert for Answer!!
Dissertation: Assignment the final report on the ewb project after a
Reference No:- TGS01654983

Expected delivery within 24 Hours