Assigning overhead on the basis of direct labor cost


Problem: Calculate the monthly quality control cost to be assigned to the Satin Sheen product line under each of the following product costing systems.

1. Traditional system which assigns overhead on the basis of direct labor cost

2. Activity based accounting

Apply quality control costs uniformly to all products at a rate of 14.5% of direct labor cost.

Direct labor cost is $27,500

Activity cost pool Cost driver Pool rates quantity of driver for satin sheen

Incoming material Type of material $11.50 12 units
Inprocess inspection # of units $.14 per unit 17,500 units
Product certification per order 77.00 per order 25 orders

Solution Preview :

Prepared by a verified Expert
Strategic Management: Assigning overhead on the basis of direct labor cost
Reference No:- TGS01983444

Now Priced at $25 (50% Discount)

Recommended (92%)

Rated (4.4/5)