As a design or engineering professional would you prefer


As a design or engineering professional, would you prefer that any dispute with the owner be arbitrated separately or together with the contractor’s claim (which may well blame the design or the a/e’s administration of the project)? Is it fair to force the owner to conduct two separate arbitrations involving the same project?

Request for Solution File

Ask an Expert for Answer!!
Operation Management: As a design or engineering professional would you prefer
Reference No:- TGS02587806

Expected delivery within 24 Hours