Analyzing the traditional manufacturing approach


Assignment:

Michigan Machining Company machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 70 parts. A part requires 3 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 8 minutes.

Under the lean manufacturing philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 6 parts and the move time is eliminated.

Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place.


Traditional Philosophy Lean Manufacturing Philosophy
Value-added time
min
min
Non-value-added time
min
min
Total lead time
min
min
Value-added ratio (as a percent)
%
%

Provide complete and step by step solution for the question and show calculations and use formulas.

 