Analyze the under applied overhead figure


Problem:

Highland Shortbread produces a single product and uses a standard cost system to help control costs. Manufacturing overhead is applied to production on the basis of standard machine hours. According to the company's flexible budget, the following overhead costs should be incurred at an activity level of 18,000 machine hours (the denominator activity level chosen for the year).

Variable manufacturing overhead cost 31,500
Fixed Manufacturing overhead cost     72,000
Total Manufacturing overhead cost    103,500

During the year, the following operating results were recorded:

Actual machine hours worked                                  15,000
Standard machine hours allowed                              16,000
Actual variable manufacturing overhead cost incurred 26,500
Actual fixed manufacturing overhead cost incurred      70,000
At the end of the year, the company's Manufacturing Overhead account contained the following data:
Manufacturing Overhead
Actual Cost 96,500    Applied Costs 92,000
4,500

Management would like to determine the cause of the 4,500 under applied overhead.

1) Compute the predetermined overhead rate of the year. Break it down into variable and fixed cost elements.

2) Show the 92,000 "applied costs" figure in the Manufacturing Overhead account was computed.

3) Analyze the 4,500 under applied overhead figure in terms of the variable overhead spending and efficiency variances and the fixed overhead budget and volume variances.

4) Explain the meaning of each variance that was computed in (3) above.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Analyze the under applied overhead figure
Reference No:- TGS01929092

Now Priced at $25 (50% Discount)

Recommended (90%)

Rated (4.3/5)