Analyze the effects of given schedule variances


EVM Assignment

Project Management: The Managerial Process, Ch. 13 and Electroscan, Inc. Student Table spreadsheet

Evaluate the Earned Value Management (EVM) Case Study found on p. 499 in Project Management: The Managerial Process, Ch. 13.

Calculate EVM information from the data provided using the Electroscan, Inc. Student Table spreadsheet and draw conclusions regarding the project's status in the case study.

Draw conclusions regarding project health from the Earned Value analysis.

Analyze the effects of given schedule variances, as well as SPI, CPI, EAC, TCIP, and any other EVM analytical products they deem valuable.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.