Analyze implications of changes in the parameters of project


Assignment: Cost And Schedule Of Project Management

A project has an expected duration of 34 weeks with a critical path variance of 6. Suppose the project network is given and the critical path is identified on the network. Suppose the normal time, crash time, and the associated cost for each activity is given. You have been asked by your supervisor to prepare a research paper that addresses the follow criteria:

• What is the probability that the project will be completed in 32 weeks or less?

• If the project is to be shortened by four days, list the process you would take to determine which activities, in order of reduction, would be shortened and the resulting cost.

• Describe project cost and the requirements for its determination and application in a production facility.

• Analyze implications of changes in the parameters of project timing and cost determination.

• Evaluate application of project cost and timing concepts on a firm's business operations.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Analyze implications of changes in the parameters of project
Reference No:- TGS03013387

Now Priced at $35 (50% Discount)

Recommended (95%)

Rated (4.7/5)