An order for 200 of a product is processed on work centers


An order for 200 of a product is processed on work centers A and B. The setup time on A is 30 minutes, and run time is 20 minutes per piece. The setup time on B is 50 minutes, and the run time is 10 minutes per piece. Wait time between the two operations is four hours. The move time between A and B is ten minutes. There is no waiting after operation B. The move time from B into stores is 15 minutes. There is no queue at either workstation. Calculate the total manufacturing lead time for the order.

A. 4435 minutes

B. 5435 minutes

C. 6435 minutes

D. 7435 minutes

E. None of them