An operator at a wastewater treatment plant decided to


1.An operator at a wastewater treatment plant decided to increase the SRT from 5 days to 10 days. How will this change affect: a. the oxygen requirement b. MLVSS in the aeration tank c. the effluent BOD or COD d. and the sludge generation

2.If a hand-held GPS unit locates a latitudinal position with an uncertainty of + - 0.05-seconds, what is the distance uncertainty at the surface of the ellipsoid (answer in + - feet

3.Determine the critical load of a round wooden dowel that is 49 in. long and has a diameter

(a) 0.325i in

(b) 0.5 in. use E= 1.6*10^3 psi.

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: An operator at a wastewater treatment plant decided to
Reference No:- TGS0815912

Expected delivery within 24 Hours