An industry discharges 5m3s of waste with a 5 day cbod of


An industry discharges .5m^3/s of waste with a 5 day CBOD of 500 mg/l to a river with a flow of 2 m^3/s and a 5 day CBOD of 2 mg/l calculate the 5 day CBOD of the river after mixing with the waste.

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: An industry discharges 5m3s of waste with a 5 day cbod of
Reference No:- TGS0654952

Expected delivery within 24 Hours