An engineer is required to survey a nonrectangular plot of


An engineer is required to survey a nonrectangular plot of land but is unable to measure side UT directly (see Figure 2.11). The following data are taken: RU=121.0m, RS=116.0m, ST=83.5m, angle RST= 113 degrees, and angle RUT= 82 degrees.Calculate the length of side UT and the area of the plot.

Request for Solution File

Ask an Expert for Answer!!
Electrical Engineering: An engineer is required to survey a nonrectangular plot of
Reference No:- TGS0590119

Expected delivery within 24 Hours