An assembly line with 60 activities is to be balanced the


An assembly line with 60 activities is to be balanced. The total amount of time to complete all 60 activities is 84 minutes. The longest activity takes4.8 minutes and the shortest takes .6 minutes. The line will operate for 960 minutes per day.

What are the maximum and minimum cycle times?

What output rate will be achieved by each of those cycle times?