An assembly line has the following tasks times shown in


An assembly line has the following tasks (times shown in minutes).

a. Six assemblies are required per hour. Balance the line (Tips: Calculate required cycle time and theoretical work stations.)

b. What is the efficiency of the line?

c. Balance the line if task e has a time of 1 minute instead of 3. After rebalance, what is the efficiency of the line?