An analyst has timed a metal-cutting operation for 50


An analyst has timed a metal-cutting operation for 50 cycles. The average was 10.40 minutes, and the standard deviation was 1.20 minutes for a worker with a performance rat. ing 125 percent. Assume an allowance of 16 percent of job time. Find the standard time for of this operation.