As the acceptable level of detection risk increases, an auditor may change the

A) Assessed level of control risk from below the maximum to the maximum level.

B) Assurance provided by tests of controls by using a larger sample size than planned.

C) Timing of substantive tests from year-end to an interimdate.

D) Nature of substantive tests from less effective to more effective procedures.