Acceptable level of detection risk problem


As the acceptable level of detection risk increases, an auditor may change the :

A. Assessed level of control risk from below the maximum to the maximum level.

B. Assurance provided by tests of controls by using a larger sample size than planned.

C. Timing of substantive procedures from year-end to an interim date.

D. Nature of substantive procedures from less effective to more effective procedures.

Request for Solution File

Ask an Expert for Answer!!
Accounting Basics: Acceptable level of detection risk problem
Reference No:- TGS042627

Expected delivery within 24 Hours