A worker-machine operation was found  to involve 3.5 minutes of machine time per cycle in the course of 40  cycles of stopwatch study. The worker's time averaged 2.7 minutes per  cycle, and the worker was given a rating of 120 percent (machine rating  is 100 percent). Midway through the study, the worker took a 10-minute  rest break. Assuming an allowance factor of 14 percent of work time  which is appliedonly to the worker element (not the machine element),  determine the standard time for this job. (Do not round intermediate  calculations. Round your final answer to 2 decimal places.)