A time study was conducted on a job that contains four


Problem

A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table.



OBSERVATIONS (minutes per cycle)

Element Performance
Rating
1 2 3 4 5 6
1 90%        0.44 0.50 0.43 0.45 0.46 0.46
2 85           1.50 1.59 1.47 1.51 1.49 1.52
3 110           0.84 0.89 0.77 0.83 0.86 0.80
4 100           1.10 1.14 1.08 1.17 1.16 1.26

a. Determine the average cycle time for each element. (Round your answers to 3 decimal places.)

b. Find the normal time for each element. (Round your answers to 3 decimal places.)

c. Assuming an allowance factor of 11 percent of job time, compute the standard time for this job. (Round your answers to 3 decimal places.)

Request for Solution File

Ask an Expert for Answer!!
Operation Management: A time study was conducted on a job that contains four
Reference No:- TGS02716203

Expected delivery within 24 Hours