a the total estimated time for an operation ie


a) The total estimated time for an operation ie assembly of a pin is 2 minutes. If the rating is 120% determine normal time. If total allowances allowed are 10% for that job, calculate the standard time.

b) Why is it important to maintain time standards? Also mention limitations of time study.

Request for Solution File

Ask an Expert for Answer!!
Mechanical Engineering: a the total estimated time for an operation ie
Reference No:- TGS0284001

Expected delivery within 24 Hours