A product needs to go through only one of the three


A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations? (the operations are in parallel).

Sanding: 1.8 units/hr

Drilling: 5 units/hr

Welding: 5 units/hr

Assembly: 0.8 units/hr

Assembly: 0.8 units/hr

Assembly: 0.8 units/hr

2.5 units/hr : Sawing

x y graph

c) The throughput time of the overall system is _______ minutes? (round your response to two decimal places