A job requires excavating and hauling 500 cyds in situ of


a job requires excavating and hauling 500 cyds (in situ) of sandy soil. in your posession is an excavator and a dump truck (capacity 30 cyds loose) the dump truck has a round trip travel time of 5 mins and 45 secs to the dump site and back. how many hours will it take approx to complete this job? assume a swell factor of 20%