A in exercise 92 change the acceptance number from 1 to 0


(a) In Exercise 92 change the acceptance number from 1 to 0 and sketch the OC curve.

(b) How do the producer's and consumer's risks change if the AQL is 0.05 and the LTPD is 0.3 in both sampling plans?

Exercise 92

Sketch the OC curve for a sampling plan having a sample size of 15 and an acceptance number of 1.

Request for Solution File

Ask an Expert for Answer!!
Basic Statistics: A in exercise 92 change the acceptance number from 1 to 0
Reference No:- TGS01513363