A flexible machining system is being planned that will


Question: A flexible machining system is being planned that will consist of four workstations phis a part handling system. Station 1 will be a load/unload station. Station 2 will consist of horizontal machining centers. Station 3 will consist of vertical machining centers. Station 4 will be an inspection station. For the part mix that will be processed by the FMS, the workloads at the four stations are: WL1 = 7.5 min, WL2 = 22.0 min, WL3 = 18.0 min, and WL4 = 102 min. The workload of the part handling system WL5 = 8.0 min. The FMS will be operated 16 day, 250 day/yr. Maintenance will be performed during nonproduction hours, so uptime proportion (availability) is expected to be 97%. Annual production of the system will be 50,000 parts. Determine the number of machines (servers) of each type (station) required to satisfy production requirements.

Request for Solution File

Ask an Expert for Answer!!
Management Theories: A flexible machining system is being planned that will
Reference No:- TGS02248614

Expected delivery within 24 Hours