A construction suveyour using a steel tape is pulling a


A construction suveyour using a steel tape is pulling a critcal measurement for layout of a building. The terrain in the in the immediate area does not allow for level measuring area. if the suveyour verifiies the diffence in elevation between the point measured from. and the point measured to, as 8.93 feet, and measurement pulled along the slope ground is 82 feet, 4 1/2 inches , What it would the horizontal distance between the two point be?

Which one is correct is a-82.38 feet or b- 82.86 feet , or c- 73.45 or may be is d-81.89 wich one is the one?