A canal was constructed running parallel to a river 1500 ft


A canal was constructed running parallel to a river 1500 ft away. Both fully penetrate a sand aquifer with a hydraulic conductivity of 1.2 ft/d. The area is subject to rainfall of 1.8 ft/y and evaporation of 1.3 ft/y. The elevation of water above the base of the aquifer in the river is 31 ft and in the canal is 27 ft. Determine

(A) the water divide,

(B) the maximum water table elevation,

(C) the daily discharge per 1000 feet into the river, and

(D) daily discharge per 1000 feet into the canal.

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: A canal was constructed running parallel to a river 1500 ft
Reference No:- TGS0823101

Expected delivery within 24 Hours