A bill of material whose purpose is to simplify forecasting


1. Which of the following statements is best?

1) using a non-bottleneck 100% of the time produces 100% utilization

2) time saved at a non-bottleneck saves nothing

3) the capacity of a system depends on the capacity of the bottleneck

4) a and b only are true

5) b and c only are true

2. A bill of material whose purpose is to simplify forecasting, master production scheduling and material requirements planning is called:

1) a summarized parts list

2) where-used bill

3) planning bill

4) structured bill

5) multi-purpose bill