A 300-acre forested watershed in fair hydrologic condition


A 300-acre forested watershed in fair hydrologic condition located on the clayey flat coastal region of Southern California receives 4.0 in. of rain in a 24 hr period. Determine the corresponding flood peak of the runoff using the SCS curve number method.

Request for Solution File

Ask an Expert for Answer!!
Civil Engineering: A 300-acre forested watershed in fair hydrologic condition
Reference No:- TGS0658671

Expected delivery within 24 Hours