A 1000kva transformer is at full load with a 05 lagging


A 1000KVA transformer is at full load with a 0.5 lagging powerfactor. If the line voltage is 500 volts at 60Hz. Find the New Volt-Ampere quanties needed to improve the power factor to 0.95 byadding capacitors in parrallel with the transformer.