7513nsc safety management systems assessment - accident


Task 1:

This task (in part) requires the construction of an AcciMap diagram related to a specific accident. You will then be asked to analyse and discuss aspects of the accident in relation to a Safety Management System (SMS) and the aviation industry in general.

Except where the use of additional external references are specifically requested, use the supplied National Transportation Safety Board (NTSB) accident report regarding Asiana Airlines (NTSB, 2014) as the primary reference document for this task.

Question 1A:

Using only information from the NTSB (2014) accident report, construct an AcciMap diagram using the guidance provided by the document Guidelines for AcciMap Analysis (Branford, Naikar, & Hopkins, 2009).

Ensure your diagram provides sufficient interacting factors, including those at higher levels and not just those focussed on the immediate cause of the accident, to provide a clear understanding of how and why this accident happened.

Use the sample AcciMap shown at Figure 2 of Branford, Naikar, & Hopkins (2009), as an example of a completed AcciMap diagram. To assist in achieving this, and to avoid the construction of a massive and complex document that would be difficult to include in your submission, take note of the guidance listed by Branford, Naikar, & Hopkins (2009, p. 203) recommending the inclusion of only two types of causes.

If you are unsure about the computer skills needed to produce the AcciMap diagram, consult the Information Technology specialists at the library or your fellow students (via the Discussion Board?) about techniques to produce the AcciMap diagram as an attachment to your Word document submission. The AcciMap diagram attachment will not be included in the word count for this assessment. If you are unable to complete the AcciMap diagram as part of the Word document, it is acceptable to submit a scanned document of the AcciMap diagram you produce. Methods for submission of a scanned separate document will be advised on request. In all cases, ensure your AcciMap is legible as I will be unable to contact you to seek clarification.

Question 1B

Provide an analysis and discussion of your AcciMap diagram. Your discussion should demonstrate your understanding of how AcciMaps assists in establishing how factors in all parts of a sociotechnical system contribute to an organisational accident (Branford, Naikar, & Hopkins, 2009, p. 193). Use any references you desire to aid your explanation.

Caution: do not simply restate theory, or paraphrase sentences and statements from the accident report (NTSB, 2014) and Branford, Naikar, & Hopkins (2009), or any of your other sources, to analyse and discuss your AcciMap diagram.

Question 2:

The International Civil Aviation Organisation (ICAO) (2013) states the framework of a Safety Management System (SMS) contains four components and twelve elements.

Using each of the four SMS components as headings, and using only the supplied accident report (NTSB, 2014) as a source, identify one aspect of the accident for each of the four components of a SMS, that you feel could relate specifically to that SMS component.

Provide an analysis and discussion of each of the four points you choose, to demonstrate your understanding of its relationship with the specific SMS component. Use any references you desire to aid your explanation.

Caution: do not simply restate theory, or paraphrase sentences and statements from the accident report (NTSB, 2014) and Branford, Naikar, & Hopkins (2009), or any of your other sources, to answer this question.

Question 3:
The Executive Summary of the accident report (NTSB, 2014, pp. xi-xv) provides a list of safety issues discussed in the report. One of the issues relates to the need for: More manual flight for Asiana pilots.

Analyse and discuss this safety issue from two perspectives:

1. Its relevance and application to the aviation industry in general, and

2. What components or elements of the SMS at Asiana you would ensure are in place, to address this safety issue?

Use any references you desire to aid your analysis and discussion.

Caution: do not simply restate theory, or paraphrase sentences and statements from the accident report (NTSB, 2014) and Branford, Naikar, & Hopkins (2009), or any of your other sources, to answer this question.

References

- Quality

- In-text and reference list citation technique in accordance with APA 6 methods

Question 1A: AcciMap diagram

An AcciMap diagram is supplied. The AcciMap diagram conforms to the guidance supplied. The AcciMap Diagram provides su?cient interacting factors, including those at higher levels, to provide a clear understanding of how and why the accident happened.

Question 1B: AcciMap discussion and analysis

The analysis and discussion relates to the submitted AcciMap diagram. The analysis and discussion demonstrates a good understanding of how AcciMaps assists in establishing how factors at all levels contribute to an organisational accident.

Question 2: SMS

Component identifcation, analysis and discussion

One aspect of the accident is identi?ed and correctly applied for each of the four components of an SMS. The analysis and discussion of each aspect chosen demonstrates a good understanding of the relationship it has with that component of an SMS.

Question 3: Safety issue analysis and discussion

The issues in the accident report analysed and discussed are correctly identi?ed as being related to manual ?ight skills. The analysis and discussion related to more manual ?ight for pilots is relevant and appropriately applied to discuss the impact it has on the aviation industry in general. Examples are used to display a good understanding. The discussion and analysis correctly identi?es the correct components or elements of the SMS at Asiana that need to be in place to address the safety issue of more manual ?ight for pilots. Examples are provided to display a good understanding.

References: Quality and citation technique

References are good quality from a published or reliable academic source. In-text citations and the reference list comply with the APA 6 technique.

Request for Solution File

Ask an Expert for Answer!!
Dissertation: 7513nsc safety management systems assessment - accident
Reference No:- TGS01477779

Expected delivery within 24 Hours