1 formulate the problem as a linear problem with the


Client Hours
A 180
B 75
C 100
D 85
Consultant A B C D
AVERY 100 125 115 100
BAKER 120 135 115 120
Campbell 155 150 140 130
1) Formulate the problem as a linear problem, with the optimal solution providing the hours each consultant should be scheduled for each client to maximize the consulting firms billing. what is the schedule and what is the total billing?

2) new information shows that Avery does not have the experience to be scheduled for client B. if this consulting assignment is not permitted, what impact does it have on total billing? what is revised schedule?