The solution to the Linear programming relaxation is: x1 = 5.714, x2 = 2.571 What is the optimal value of z of this integer linear programming problem?
What do these measures of competitiveness and comparative strength tell you about the E-Top company and the industry in which it operates?
Find the level of production that will maximize the company's total revenue and then determine this revenue.
A production planner must determine the sequence to process 6 customer orders. Each of the orders must go through two principal operations.
Suppose the total cost function for manufacturing a certain product is C(x) = 0.2(0.01x2 + 120) dollars, where x represents the number of units produced.
Height of an object shot straight upward from the ground with an initial velocity of 64ft per square is given by the equation h = 64t - 16t².
A company holds spare parts for its car maintenance service. There is a steady demand for these parts.
You are in the market for oranges. The supply equation (in millions) for oranges is : S(P)= .3p^2 +11P - 40 The demand equation is D(P) = .7p^2 +P - 1
By cutting away identical squares from each corner of a rectangular piece of cardboard and folding up the resulting flaps, an open box may be made.
A manufacturer finds that the total profit from producing and selling Q units of a product is given by the profit function: Total Profit = f(Q) = - 460 + 100Q
The steps of the scientific method are a) observation, problem definition, model construction, model solution, implementation.
Linear programming problem: Graphical solution.The Outdoor Furniture Corporation manufactures two products, benches and picnic tables
Explain the difference between profit and contribution in an objective function.
An ice block used for refrigeration is modeled as a cube of side s. The block currently has volume of 125,000 cm3, and is melting at the rate of 1,000 cm3.
What academic outcomes does the teacher expect for this student?
Explain the connection between reduced costs and the range of optimality, and between dual prices and the range of feasibility.
Sand is being poured on a conical pile at the rate of 12 cubic feet per minute, the height of the pile being three times its diameter throughout.
Use implicit differentiation to find the dy/dx: 3xy + x2y2 = 1, Find the indicated higher order derivative of the following functions.
Determine the resources left over and not used at the optimal solution point. Do not use excel solver to solve the solution.
What is the lowest value for the amount of time available to setup the display before the solution (product mix) would change?
Determine the slope of the tangent to each of the following curves: y=2/x^2
The percent of mothers who work outside the home and have children younger than age 6 yr is approximated by the following function.
A manufacturer has determined that the total cost C of operating a factory is C = 0.5x2 + 15x +5000.
Find the y coordinates of each stationary point on the graph of the function f(x) and evaluate f(0).
Why should decision makers who are primarily concerned with marketing or finance or production know about linear programming?