Problems related to Integral Abutment Bridge
What are the problems related to Integral Abutment Bridge?
Expert
There are some problems concerning the heaving and settlement of backfill in bridge abutment. Like “granular flow” takes place in backfill materials and it is a type of on-going consolidation. Settlement of backfill goes on with every day temperature cycles and it does not become stable. Active failure of upper part of backfilling material also takes place with wall rotations. This makes the way for backfill densification and can also make settlement behind the abutment worse.
Explain the term cement concrete and list the various properties of concrete?
Explain marine (hydrographic) surveying and astronomical surveying.
Write short note on Steam Turbines.
Explain all the types of Piles that are available in the market.
read questions properly and follow marking criteria
What are the instruments used in tachcometry
Name all the classification of hand moulding and explain them?
Define the term: a) True bearing. b) Magnetic bearing.
Explain the differences between thermoplastics and thermosetting plastics.
Causes of building collapse: The Passage of time is one cause. Buildings as well collapse due to feeble foundations. Hurricanes, Earthquakes and other natural disasters can too damage the structure of the buildings and cause it to fall down. Bombings
18,76,764
1959152 Asked
3,689
Active Tutors
1446427
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!