Explain parasitic forces for pre-stressing
Explain parasitic forces for pre-stressing?
Expert
In the structures which are statically determinate, pre-stressing forces causes the concrete arrangements to bend upwards. Hence, pre-cambering is normally carried out to counteract such effect and make it more pleasant in looks. For statically undetermined structures the deformation of concrete members are restrained by the supports and consequently parasitic forces are developed by the pre-stressing force in addition to the bending moment generated by eccentricity of pre-stressing tendons. The developed forces at the support modify the reactions of concrete members subjected to external loads and produces secondary moments (or parasitic moments) in the structure.
What is the purpose of an Economizer and Super Heater in boilers?
How do vortex-induced vibrations affect the stability of long bridges?
What are the properties of good Lubricating Oil?
Specify some of the methods required to increase the isothermal efficiency?
What do you understand by Blading Efficiency ?
How does the reinforcement function in the embankment is built on the soft clay?
Discuss function of Carburetor?
Explain EC engines with an example.
There are three questions. Total word range of 2500-3000 words.
Main purpose of gap in the road on bridge: The main purpose of the gap in the road is to permit the road to expand and contract with temperature modifications without causing harm or deformation to road.
18,76,764
1943545 Asked
3,689
Active Tutors
1427205
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!