Explain parasitic forces for pre-stressing
Explain parasitic forces for pre-stressing?
Expert
In the structures which are statically determinate, pre-stressing forces causes the concrete arrangements to bend upwards. Hence, pre-cambering is normally carried out to counteract such effect and make it more pleasant in looks. For statically undetermined structures the deformation of concrete members are restrained by the supports and consequently parasitic forces are developed by the pre-stressing force in addition to the bending moment generated by eccentricity of pre-stressing tendons. The developed forces at the support modify the reactions of concrete members subjected to external loads and produces secondary moments (or parasitic moments) in the structure.
Discuss the pre-action steps (what to prepare as a Project Engineer) w Discuss the pre-action steps (what to prepare as a Project Engineer) when disputes arise e.g. initiating a claim and defending a claim.
Give the effects of detonation.
Describe the function of Camshaft and Crank shaft?
State the types of lubrication used in IC engines?
List the types of surveying.
How the modification in the compression ratio affects the air standard efficiency of an Ideal Otto Cycle?
Define the following: a) Dry air b) Moist air c) Dry bulb temperature d) Wet bulb temperature
Write brief note on Crank Case Compression.
Answer the given questions. The slab shown below forms a walkway between buildings in a new hospital complex.
What are the advantages of Centrifugal Pump?
18,76,764
1954539 Asked
3,689
Active Tutors
1430986
Questions Answered
Start Excelling in your courses, Ask an Expert and get answers for your homework and assignments!!