What is the final velocity of the bullet-block
An 8.1g bullet is fired with a velocity of 109m/s into a 98g block of wood at rest on a frictionless surface. The bullet lodges in the block and they slide off together. What is the final velocity of the bullet-block?
Expected delivery within 24 Hours
State the degrees of freedom for this experiment: Using minitab or hand calculate the test statistic: (Enter to the nearest whole value) State the decision as either r for reject Ho or f for fail to reject Ho:
A computer disk rotates at a constant angular speed of 34.1rad/s while being read. when searching for a file, the disk spins for 0.892s. a) what is the angular displacement of the disk during this time?
A common laboratory reaction is the neutralization of an acid with a base. When 60.0 mL of 0.25 M nitric at 24.5 degree C is added to 60.0 mL of 0.275 M NaOH at 24.5 degree C in a coffee cup calorimeter, the temperature of the mixture rises to 30.
Aluminum Oxide (Al2O3) has a surface energy of 1 J/m2, estimate the maximum amount of energy (J/g) that is available for densification for spherical particles with a diameter of 1 micron.
In 1945 1,100 adult Americans were asked if they abstain from alcoholic beverages and 363 indicated that they were total abstainers. A recent pole asked 1,100 adult Americans if they abstain from alcoholic beverages,
A car traveling 85 km/hr strikes a tree. the front end of the car compresses and the driver comes to a rest after traveling 0.80m. What was the average acceleration of the driver during the collision?
Steam enters an adiabatic turbine steadily at 3 MPa and 400 deg C and leaves at 70 kPa and 100 deg C. if the power output of the turbine is 2 MW (mega watt), determine the isentropic efficiency of the turbine?
When a sample of a simple hydrocarbon,CxHy, is burned in oxygen 0.300 g ofCO2 and 0.123 g of H2O are isolated. Themolecular weight of the compound was determined to be 70.1 g in aseparate experiment.
1960771
Questions Asked
3,689
Active Tutors
1431203
Questions Answered
Start Excelling in your courses, Ask a tutor for help and get answers for your problems !!
ArtDesign produces 2 types of Art-by-Number kits -- Marker and Paint. In production, each kit passes through 2 processes: Printing and Packaging.
Productivity is higher at agencies where average employee satisfaction is highest.
Question: How can project managers ensure plan visibility for stakeholders? Select all that apply.
According to our readings, older workers who have achieved life milestones have different career goals and motivations than young people.
Question: From the list below, what is necessary for successful career planning for an employee?
Our group proposes to initiate a Community Garden Project aimed at promoting sustainable living and community engagement in our local area.
This course explored many perspectives of Customer Relationship Management (CRM) as a process and philosophy in which profit or non-profits leaders implements