Make sure to show all your work to get full credit the


This exam consists of two parts.The first part consists of five (5) research-based case study questions. Be sure to cite any appropriate reference material. The second part of the examination shall consist of five (5) problem. Students must show their work for full credit. Answer all the questions.

Case Study Questions:

There is no set length for answers; students may be as verbose or brief as they feel necessary to cover the question. Use this same exam document for your answers, placing them below each question. This portion of the exam is worth 100 points.

Problem Questions:

Make sure to show all your work to get full credit. The instructor needs to know the formulas and calculations you used to get to your final answer. You can do part of the exam in Excel and Paste your Excel work into this document. This portion of the exam is worth 50 points.

Exam Essay Questions

Question 1:

You are designing a grocery delivery business. Via the internet, your company will offer staples and frozen foods in a large metropolitan area and then deliver them within a customer-defined window of time. You plan to partner with two major food stores in the area. What should your competitive priorities be and what capabilities do you want to develop in your own core and support processes?

Is it possible for a project to have more than one critical path? Discuss the implications of such a situation with respect to each of the following aspects:

Project risk
Total available slack
Resource dependencies
Responsibilities of the project manager

Question 2:

A flowchart helps us see all of the steps in a process, which in turn helps us improve the process. It also helps us identify and eliminate any redundant steps in a process. Using Word tools (SmartArt under the Insert tab), design a process flow chart for the grocery delivery business in Question 1 above. In the discussion element of your response, clearly define the steps within the process and provide a rationale for each step. Include all elements that you feel are necessary and appropriate to the process of a singular customer. The assumption is that the process is repeatable for every customer using the service. Think of the elements that you will be addressing or answering in the succeeding questions.

Question 3:

For the grocery delivery business addressed in Question 1, the grocery chains that you are planning to partner with use differing inventory control models. Company A utilizes the Just-in-Time (JIT) inventory control model and Company B uses an Economic Order Quantity model. In reviewing your business plan, the bank loan officer has noticed this. As the loan officer is not overly familiar with either model, a request has been made of you to provide a description of each model and an explanation of why partnering with these companies would or would not create a conflict within your operations. Provide a detailed analysis of the situation in your business model.

Question 4:

A Quality Assurance (QA) Program is essential to the success of any business.In establishing your grocery delivery business, what are some of the Quality Control (QC) processes that you envision employing? Why? Provide examples of potential metrics. Justify your choices.

Question 5:

Efficiency is a critical element both in terms of individuals and machinery in any business. Describe some efficiency measures that you would implement in your grocery delivery business. What are the analysis tools that you would utilize to determine the effectiveness of these efficiency measures?

Exam Problem Questions

Problem 1.

The Bureau of Labor Statistics collects input and output data from various countries for comparison purposes. Labor hours are the standard measure of input. Calculate the output per hour from the following data. Which country is most productive?

 

Labor Hours

Units of Output

United States

89.5

136

Germany

83.6

100

Japan

72.7

102

Problem 2.
Construct a network from the information in the following table and identify all the paths in the network, compute the length of each, and indicate the critical path. Determine the earliest start and finish times, latest start and finish times, and slack for each activity. Indicate how the critical path would be determined from this information.

Activity

Activity Predecessor

Time (weeks)

1

-

 7

2

-

10

3

1

 6

4

2

 5

5

2

 4

6

3, 4

 3

7

5, 6

 2

Problem 3.

The Omega Shoe Company manufactures a number of different styles of athletic shoes. Its biggest seller is the X-Pacer running shoe. In 2008 Omega implemented a quality-management program. The company's shoe production for the past three years and manufacturing costs are as follows.

 

Year

 

2008

2009

2010

Units produced/input

  32,000 

 34,600 

 35,500 

Manufacturing cost

$278,000 

291,000 

305,000 

Percent good quality

     78%

     83%

     90%

Only one-quarter of the defective shoes can be reworked, at a cost of $2 apiece. Compute the manufacturing cost per good product for each of the three years and indicate the annual percentage increase or decrease resulting from the quality-management program.

Problem 4.

A firm is faced with the attractive situation in which it can obtain immediate delivery of an item it stocks for retail sale. The firm has therefore not bothered to order the item in any systematic way. However, recently profits have been squeezed due to increasing competitive pressures, and the firm has retained a management consultant to study its inventory management. The consultant has determined that the various costs associated with making an order for the item stocked are approximately $70 per order. She has also determined that the costs of carrying the item in inventory amount to approximately $27 per unit per year (primarily direct storage costs and forgone profit on investment in inventory). Demand for the item is reasonably constant over time, and the forecast is for 16,500 units per year. When an order is placed for the item, the entire order is immediately delivered to the firm by the supplier. The firm operates 6 days a week plus a few Sundays, or approximately 320 days per year. Determine the following:

a. Optimal order quantity per order
b. Total annual inventory costs
c. Optimal number of orders to place per year
d. Number of operating days between orders, based on the optimal ordering.

Problem 5.

The Commonwealth Banking Corporation issues a national credit card through its various bank branches in five southeastern states. The bank credit card business is highly competitive and interest rates do not vary substantially, so the company decided to attempt to retain its customers by improving customer service through a reduction in billing errors. The credit card division monitored its billing department process by taking daily samples of 200 customer bills for 30 days and checking their accuracy. The sample results are as follows:

Sample

Number of Defectives

Sample

Number of Defectives

 1

 7

16

10

 2

12

17

12

 3

 9

18

14

 4

 6

19

16

 5

 5

20

15

 6

 8

21

13

 7

10

22

 9

 8

11

23

10

 9

14

24

12

10

10

25

15

11

 9

26

14

12

 6

27

16

13

 3

28

12

14

 2

29

15

15

 8

30

14

Develop a -chart for the billing process using control limits and indicate if the process is out of control.

Request for Solution File

Ask an Expert for Answer!!
Operation Management: Make sure to show all your work to get full credit the
Reference No:- TGS01000670