Question: During 2017, Cotte Manufacturing expected Job No. 59 to cost $300,000 of overhead, $500,000 of materials, and $200,000 in labor. Cotte applied overhead based on direct labor cost. Actual production required an overhead cost of $295,000, $570,000 in materials used, and $220,000 in labor. All of the goods were completed. How much is the amount of over- or underapplied overhead?