Discuss the importance of work packages to support creation


Assignment: Cost & Schedule Control Research Paper

The Research Paper must demonstrate the understanding of new learning in project management and how it relates to cost and value management. This assignment should be six to eight pages (not including the title and reference pages) and should integrate the reading, multimedia, and class discussions. It is mandatory to have research from the classroom text, as well as at least three scholarly sources from the Internet or Ashford Online Library to support your views.

Consider the validity of your sources carefully before using them in academic papers. It is recommended to use examples from your professional experience where possible or build from your learning in the discussion boards.

Focus of the Research Paper

Use at least one project you have been a team member of or a project manager for as an example to contextualize the research topics below:

All of the following topics must be addressed in order for the paper to be completed

• Discuss the importance of work packages to support the creation and use of the WBS.
• Examine how to establish a cost and schedule performance measurement baseline.
• Present examples of EVM and how it will help the PM understand project status.
• Examine how the PM uses project control charts to show project status and present value.
• Recommend an effective change management process to ensure a successful project.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Discuss the importance of work packages to support creation
Reference No:- TGS02981947

Now Priced at $60 (50% Discount)

Recommended (95%)

Rated (4.7/5)