Analyze the remedial measures implemented or proposed


Assignment

Identify a site in your state that is being or has been cleaned up under the federal super fund program.:

The site is in Arizona, Abandoned Uranium Mine. Navajo Reservation in the southwest

• The environmental health risks associated with the contaminants

• The remedial measures implemented or proposed

Prepare a 4 slides Microsoft® PowerPoint® presentation on the Superfund project that illustrates the findings from your research with speaker notes .

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Other Subject: Analyze the remedial measures implemented or proposed
Reference No:- TGS02962024

Now Priced at $30 (50% Discount)

Recommended (92%)

Rated (4.4/5)