Analyze some increased challenges a project manager may face


Assignment: Leading and managing HR project

Length: 5- 6 page paper.

Review and understand the types of project manager power listed and defined in the textbook and select and define any two you feel would be relevant to your current project and explain why. Be specific.

1. Identify and briefly discuss a minimum of four outcomes (possible issues) resulting from managing projects and address how you might resolve the issues. Be clear with your rationale.

2. Discuss some increased challenges a project manager may face when leading virtual or global project teams. Recommend a few strategies to deal with the challenges.

3. Identify and explain your overall plan for communication management during the project. The plan must be comprehensive and at a minimum address (1) structure, (2) purpose, (3) method, and (4) timing.

4. At least three quality academic (peer-reviewed) resources in this assignment.

Book - contemporary project management- Kloppenborg.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Other Subject: Analyze some increased challenges a project manager may face
Reference No:- TGS02965261

Now Priced at $45 (50% Discount)

Recommended (99%)

Rated (4.3/5)