A what are the decision variables b formulate the problem


Challenge problem. AMP Chapter 8 problem 6, parts a), b) and c). I would do part c) before part b).

The Egserk Catering Company manages a moderate-sized luncheon cafeteria featuring prompt service, delectable cuisine, and luxurious surroundings. The desired atmosphere requires fresh linen napkins, which must be available at the start of each day. Normal laundry takes one full day at 1.5 cents per napkin; rapid laundry can be performed overnight but costs 2.5 cents a napkin. Under usual usage rates, the current napkin supply of 350 is adequate to permit complete dependence upon the normal laundry; however, the additional usage resulting from a three-day seminar to begin tomorrow poses a problem. It is known that the napkin requirements for the next three days will be 300, 325, and 275, in that order. It is now mid-afternoon and there are 175 fresh napkins, and 175 soiled napkins ready to be sent to the laundry. It is against the health code to have dirty napkins linger overnight. The cafeteria will be closed the day after the seminar and, as a result, all soiled napkins on the third day can be sent to normal laundry and be ready for the next business day.

The caterer wants to plan for the napkin laundering so as to minimize total cost, subject to meeting all his fresh napkin requirements and complying with the health code.

a) What are the decision variables?

b) Formulate the problem as a linear program.

c) Interpret the resulting model as a network-flow problem. Draw the corresponding network diagram.

Solution Preview :

Prepared by a verified Expert
Business Management: A what are the decision variables b formulate the problem
Reference No:- TGS02923964

Now Priced at $10 (50% Discount)

Recommended (92%)

Rated (4.4/5)