Write a particular specification for a cut-to-fill earthwork


Assignment:

Write a particular specification for a cut-to-fill earthworks operation for a large sports field. Use the SABS 1200 format. You will have to establish realistic values for the density requirement of the fill, quality requirements and tolerances, method of payment and sufficient pay items. Use SABS 1200 DA as a guide.

Assume that the ground conditions are unknown and could include rock, hard and soft materials. Also assume that the size of the sports field is not known as the Client has not yet decided if he needs a field for soccer, rugby, cricket or hockey, or all four. Note that the project specification will include a geotechnical report and a series of drawings giving all dimensions, slopes, etc.

Note: Use of SANS equivalent to SABS allowed

CONTENTS

Description Page

1 COVER and TITLE PAGE

1.1 Title
1.2 Author
1.3 Date of report
1.4 Place
1.5 Title page

2 SYNOPSIS

2.1 Executive summary of the report
2.2 Key words

3 ACKNOWLEDGEMENTS

4 CONTENTS

4.1 Description
4.2 System of headings

5 SYMBOLS, NOMENCLATURE, GLOSSARY

5.1 Symbols
5.2 Nomenclature
5.3 Glossary

6 INTRODUCTION

6.1 Problem statement
6.2 Scope and limitations
6.3 Methodology
6.4 Summary of the content of each subsequent chapter Description Page

7 BODY OF THE REPORT

7.1 Literature review
7.2 Investigation
7.2.1 Test methods
7.2.2 Data acquired
7.2.3 Analysis
7.2.4 Discussion

8 CONCLUSIONS

9 RECOMMENDATIONS

10 REFERENCES

11 BIBLIOGRAPHY

12 APPENDIX

13 WRITING THE REPORT

13.1 Format
13.2 General advice
13.3 Checking and editing

14 BIBLIOGRAPHY

Request for Solution File

Ask an Expert for Answer!!
Other Subject: Write a particular specification for a cut-to-fill earthwork
Reference No:- TGS02019325

Expected delivery within 24 Hours