What is the total cost of the staffing plan including the


Problem 1: Arsenal Electronics is going to construct a new $1.2 billion semiconductor plant and has selected four towns in the Midwest as potential sites. The important location factors and ratings for each town are as follows:


Scores (0 to 100)

Location Factor

Weight

Abbeton

Bayside

Cane Creek

Dunnville

Work ethics

0.18

80

90

70

75

Quality of life

0.16

75

85

95

90

Labor laws/unionization

0.12

90

60

60

70

Infrastructure

0.10

60

50

60

70

Education

0.08

80

90

85

95

Labor skill and education

0.07

75

65

70

80

Cost of living

0.06

70

80

85

75

Taxes

0.05

65

70

55

60

Incentive package

0.05

90

95

70

80

Government regulations

0.03

40

50

65

55

Environmental regulations

0.03

65

60

70

80

Transportation

0.03

90

80

95

80

Space for expansion

0.02

90

95

90

90

Urban proximity

0.02

60

90

70

80

Recommend a site based on these location factors and ratings.

Problem 2: Sawyer Furniture is one of the few remaining domestic manufacturers of wood furniture. In the current competitive environment, cost containment is the key to its continued survival. Demand for furniture follows a seasonal demand pattern with increased sales in the summer and fall months, culminating with peak demand in November.

The cost of production is $16 per unit for regular production, $24 for overtime, and $33 for subcontracting. Hiring and firing costs are $500 per worker. Inventory holding costs are $20 per unit per month. There is no beginning inventory. Ten workers are currently employed. Each worker can produce 50 pieces of furniture per month. Overtime cannot exceed regular production. Given the following demand data, use Excel Solver to design an aggregate production plan for Sawyer Furniture that will meet demand at the lowest possible cost.

Input:

Beg. Wkrs

10

Regular

$16

Hiring

$500

 

 

Units/wkr

50

Overtime

$24

Firing

$500

 

 

Beg. Inv.

0

Subk

$33

Inventory

$20

 

 

Month

Demand

Reg

OT

Subk

Inv

#Wkrs

#Hired

#Fired

 

Jan

500

500

0

0

0

10

0

0

 

Feb

500

500

0

0

0

10

0

0

 

Mar

1000

1,000

0

0

0

20

10

0

 

Apr

1200

1,000

200

0

0

20

0

0

 

May

2000

1,000

1,000

0

0

20

0

0

 

Jun

400

400

0

0

0

8

0

12

 

Jul

400

400

0

0

0

8

0

0

 

Aug

1000

1,000

0

0

0

20

12

0

 

Sep

1000

1,000

0

0

0

20

0

0

 

Oct

1500

1,500

0

0

0

30

10

0

 

Nov

7000

3,500

3,500

0

0

70

40

0

 

Dec

500

500

0

0

0

10

0

60

 

Total

17,000

12,300

4,700

0

0

246

72

72


















Problem 3: A retailer experiences a seasonal demand pattern for its services. Labor requirements over a typical six-month period follow.

Period

1

2

3

4

5

6

Requirement

12

10

12

8

9

8

Costs associated with operations are as follows:

Wages = $1,500 per worker per month

Hiring cost = $1,500 per worker

Layoff cost = $1,500 per worker

The current workforce level is 11 workers. Use the spreadsheet approach and the preceding data to answer the following questions.

a. What is the total cost of the staffing plan, including the cost of regular wages, hiring, and layoffs using a chase strategy with hiring and layoffs, but no overtime?

b. What is the total cost of the staffing plan, including the cost of regular wages, hiring, and layoffs using a level strategy with hiring and layoffs, with overtime of up to 25% of the regular-time capacity, and that overtime wages are 150% of the regular-time rate.

a) CHASE Strategy

 

1

2

3

4

5

6

Total

INPUTS

 

 

 

 

 

 

 

Forecasted demand

12

10

12

8

9

8

59

Workforce level

 

 

 

 

 

 

 

Undertime

 

 

 

 

 

 

 

Overtime

 

 

 

 

 

 

 

Utilized time

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hires

 

 

 

 

 

 

 

Layoffs

 

 

 

 

 

 

 

CALCULATED

 

 

 

 

 

 

 

Utilized time cost

 

 

 

 

 

 

 

Undertime cost

 

 

 

 

 

 

 

Overtime cost

 

 

 

 

 

 

 

Hiring cost

 

 

 

 

 

 

 

Layoff cost

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Cost

 

 

 

 

 

 

 

b) LEVEL Strategy

 

1

2

3

4

5

6

Total

INPUTS

 

 

 

 

 

 

 

Forecasted demand

12

10

12

8

9

8

59

Workforce level

 

 

 

 

 

 

 

Undertime

 

 

 

 

 

 

 

Overtime

 

 

 

 

 

 

 

Utilized time

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hires

 

 

 

 

 

 

 

Layoffs

 

 

 

 

 

 

 

CALCULATED

 

 

 

 

 

 

 

Utilized time cost

 

 

 

 

 

 

 

Undertime cost

 

 

 

 

 

 

 

Overtime cost

 

 

 

 

 

 

 

Hiring cost

 

 

 

 

 

 

 

Layoff cost

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Cost

 

 

 

 

 

 

 

Don't forget to figure out the required number of employees for the Level Strategy

Problem 4: The Union Manufacturing Company is producing two types of products: A and B. The demand forecast, batch size, and time standards for the Mark I operation follow:

 

Product A

Product B

Demand forecast (units/yr.)

1,000

4,000

Batch size (units/batch)

20

10

Process time (hr./unit)

3.2

4.5

Setup time (hr./batch)

10

20

The company works 250 days per year and operates 2 shifts, each covering 8 hours. If a 20 percent capacity cushion is maintained, how many Mark I machines are required if Union does not resort to any short-term capacity options?

Problem 5: A firm of four departments has the following trip matrix and current block plan of all departments:

 Trips Between Departments

Dept. Name

A

B

C

D

A

....

14

6

9

B

 

....

7

16

C

 

 

....

2

D

 

 

 

....

A

B

D

C

 

a. What is the weighted-distance score for the current layout? (Assume rectilinear distance and that the distance between departments A and B is one unit of distance.)

b. What would be the weighted-distance score for the following layout?

A

C

D

B

 

Solution Preview :

Prepared by a verified Expert
Operation Management: What is the total cost of the staffing plan including the
Reference No:- TGS01182005

Now Priced at $50 (50% Discount)

Recommended (93%)

Rated (4.5/5)

A

Anonymous user

4/7/2016 3:35:08 AM

The issues that are on semiconductor plant and few selected Midwest as potential sites hav another more problems read them and specify your answer Problem 1: Arsenal Electronics is going to build a new $1.2 billion semiconductor plant and has selected 4 towns in the Midwest as potential sites. The significant location factors and ratings for each town are as follows: Problem 2: Sawyer Furniture is one of the few waiting domestic manufacturers of wood furniture. In the current competitive atmosphere, cost containment is the key to its continued survival. Demand for furniture follows a recurrent demand pattern through raised sales in the summer and fall months, culminating through peak demand in November. The cost of production is $16 per unit for regular production, $24 for overtime, and $33 for subcontracting. Hiring and firing costs are $500 per worker. Inventory clutching costs are $20 per unit per month.