Sheets of metal pass sequentially through 4 presses shear


Question: Sheets of metal pass sequentially through 4 presses: shear, punch, form, and bend. Each machine is subject to downtime and die change. The parameters for each machine are as follows:

1358_8.png

Note that processing time is given as a rate-for example, the shear press works at a rate of 4.5 sheets per minute. Assume that prpcessing time is constant The automated equipment makes the time to change a die fairly constant. so it is assumed to be always 25 minutes. Die changes occur between stamping of two sheets after the number shown in the table have gone through a machine. Time to failure is assumed to be exponentially distributed, with the mean given in the table. Time to repair is assumed to be uniformly distributed, with the mean taken from the table and a half-width of 5 minutes. When a failure occurs, 20% of,the sheets are scrapped. The remaining 80% are reprocessed at the failed machine after the repair. Assume that an unlimited supply of material is available in front of the shear press, which processes one sheet after the next as long as there is space available between itself and the next machine, tbe punch press. In general, one machine processes one sheet after another continuously, stopping only for a downtime, for a die change, or because the available buffer space between itself and the next machine becomes full. Assume that sheets are taken away after bending at the bend press. Buffer space is divided into 3 separate areas, one between the shear and the punch presses, the second between the punch and form presses, and the last between form arid bend.

(a) Assume that there is an unlimited amount of space between machines. Run the simulation for 480 hours (ab Out 1 month with 24 hour days, 5 days per week). Where do backups occur? If the total buffer space for all three buffers is limited to 15 sheets (not counting before shear or after bend), how would you recommend dividing this space among the three adjacent pairs of machines? Does this simulation provide enough information to make a reasonable decision?

(b) Modify the model so that there is a finite buffer between adjacent machines. When the buffer becomes full and the machine feeding the buffer completes a sheet, the sheet is not able to exit the machine. It remains in the machine blocking additional work. Assume that total buffer space is 15 sheets for the 3 buffers. Use the recommendation from part (a) as a starting point for each buffer size. Attempt to minimize the number of runs. You are allowed to experiment with a maximum of 3 buffer sizes for each buffer. (How many runs does this make?) Run a set of experiments to determine the allocation of buffer space that maximizes production. Simulate each alternative for at least 1000 hours. Report total production per hour on the average, press utilization (broken down by percentage of time busy, down, changing dies, and idle), and average number of sheets in each buffer.

Solution Preview :

Prepared by a verified Expert
Mathematics: Sheets of metal pass sequentially through 4 presses shear
Reference No:- TGS02415005

Now Priced at $15 (50% Discount)

Recommended (93%)

Rated (4.5/5)