Predetermined manufacturing overhead rate


Question:

The formula for computing the predetermined manufacturing overhead rate is estimated annual overhead= costs divided by an expected annual operating activity, expressed as:

(a) direct labor cost.
(b) direct labor hours.
(c) machine hours.
(d) Any of the above.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Predetermined manufacturing overhead rate
Reference No:- TGS02037409