Manufacturing-production scheduling kane manufacturing has


Question: MANUFACTURING-PRODUCTION SCHEDULING Kane Manufacturing has a division that produces two models of hibachis, model A and model B. To produce each model-A hibachi requires 3 lb of cast iron and 6 min of labor. To produce each model-B hibachi requires 4 lb of cast iron and 3 min of labor. The profit for each modelA hibachi is $2, and the profit for each model-B hibachi is $1.50. If 1000 lb of cast iron and 20 labor-hours are available for the production of hibachis each day, how many hibachis of each model should the division produce in order to maximize Kane's profit? What is the largest profit the company can realize? Is there any raw material left over?

Solution Preview :

Prepared by a verified Expert
Mathematics: Manufacturing-production scheduling kane manufacturing has
Reference No:- TGS02352967

Now Priced at $10 (50% Discount)

Recommended (95%)

Rated (4.7/5)