Manufacturing-production scheduling ace novelty


Question: MANUFACTURING-PRODUCTION SCHEDULING Ace Novelty manufactures "Giant Pandas" and "Saint Bernards." Each Panda requires 1.5 yd2 of plush, 30 ft3 of stuffing, and 5 pieces of trim; each Saint Bernard requires 2 yd2 of plush, 35 ft3 of stuffing, and 8 pieces of trim. The profit for each Panda is $10, and the profit for each Saint Bernard is $15. If 3600 yd2 of plush, 66,000 ft3 of stuffing, and 13,600 pieces of trim are available, how many of each of the stuffed animals should the company manufacture to maximize its profit? What is the maximum profit?