Management accounting assignment topic management


MANAGEMENT ACCOUNTING ASSIGNMENT

Topic: Management Accounting Problem.

Task Details: Students are to analyse the given information, make calculations where relevant and draw relevant, supported conclusions and make justified recommendations. Responses are to be formatted into a professional report for each part of each question, as would be expected of someone working in a modern accountant's office. Research Students need to support their analysis with reference from the text and a requirements: minimum of seven (7) suitable, reliable, current and academically acceptable sources - check with your tutor if unsure of the validity of sources.

MANAGEMENT  ACCOUNTING

The Genre company is the manufacturer of  two products the Basic and the Advanced .Details of production data and product cost data are as follows:

                                                          Basic                       Advanced

Direct material                                     40                           60

Direct labour                                        2 hours                   3 hours

Manufacturing overhead                        2 hours                   3 hours

Direct labour cost per hour                    $15 per hour           $15 per hour

Production                                           2000 units               10000 units

Manufacturing overhead has traditionally used direct labour hours to calculate the predetermined overhead rate.

The Manufacturing overhead budget is as follows:

Set up costs                                               $360,000

Engineering costs                                        180,000

 Machine related costs                                 900,000

 Plant related costs                                     192,000

 Total                                                        $1,632,000

The Genre Company has traditionally priced its products at 120 per cent of manufacturing cost. Recently the Genre company has found it has had difficulty selling its advanced product with a competitor entering the market from overseas and making substantial sales at a price considerably below Genre's price for the Advanced product.

The CEO of Genre, Jane Monk, cannot understand how this could be and has asked you to investigate the matter. You start to examine some of the data and decide  to check out a new approach to allocate costs called Activity Based Costing .You have managed to identify the following information:

Activity Cost Pool                  Cost Driver                                Budgeted level of Cost Driver

Set up costs                          Number of production runs          80 runs

Engineering costs                   Engineering changes                   200 engineering changes

Machine related costs             Machine hours                             18,000 hours

Plant related costs                 Floor space in sq ft                       3,840 sq ft

In addition the following information has been determined:

  • The Basic product is manufactured in production runs of 50 units each and the Advanced product is manufactured in 250 unit batches
  • 75% of the engineering changes are used by the Basic product with the remaining 25% used by the Advanced product
  • Each Basic product requires 4 machine hours whereas each Advanced product requires 1 machine hour
  • The plant has 3,840 square feet of floor space with 80% of it used in the production of the Basic product

Required: Using the information above and your knowledge of Activity Based Costing you are required to provide answers to the following :

(a) Calculate the predetermined overhead rate that would be used under traditional overhead costing.

(b) Calculate the product cost per unit for the Basic and Advanced products under traditional costing. 

(c) Calculate the price that would be charged for the Basic and the Advanced products under traditional costing.

(d) Calculate the cost per Activity for each cost pool.

(e) Calculate the cost per unit for Basic and Advanced  products using Activity Based Costing.

(f) Based on your calculations with respect to Basic and Advanced products comment upon whether either product has been overcosted or undercosted.

(g) Discuss the benefits that can be obtained from using an Activity Based Costing system and whether it would be useful in costing the current products.

Solution Preview :

Prepared by a verified Expert
Accounting Basics: Management accounting assignment topic management
Reference No:- TGS02164975

Now Priced at $12 (50% Discount)

Recommended (93%)

Rated (4.5/5)