Identify the burst activities and the merge activities


Assignment

I) Reflect on Chapter 9: Project Scheduling: Networks, Duration Estimation, and Critical Path Identify what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding.

Also, provide a graduate-level response to each of the following questions

II) Consider a project such as moving to a new neighborhood, completing a long-term school assignment, or even cleaning your bedroom. Develop a set of activities necessary to accomplish that project, and then order them in a precedence manner to create sequential logic. Explain and defend the number of steps you identified and the order in which you placed those steps for best completion of the project.

III) Activity 10 in Separate document - 4 full pages(excluding references)

Time Estimates (week)

Activity      Optimistic     Most Likely    Pessimistic     Immediate Predecessor(s)
A                    1                    4                      7                      -
B                    2                     6                     10                    -
C                    3                    3                      9                      B
D                    6                    13                    14                    A
E                    4                    6                      14                    A, C
F                    6                     8                     16                     B
G                    2                    5                      8                      D, E, F

i. Calculate the expected activity times (round to nearest integer).

ii. Calculate the activity slacks. What is the total project length? Make sure you fully label all nodes in the network.

iii. Identify the critical path. What are the alternative paths and how much slack time is associated with each noncritical path?

iv. Identify the burst activities and the merge activities.

v. Given the activity variances, what is the likelihood of the project finishing on week 24?

vi. Suppose you wanted to have a 99% confidence in the project finishing on time. How many additional weeks would your project team need to negotiate for in order to gain this 99% likelihood?

Format your assignment according to the following formatting requirements:

i) The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.

ii) The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

iii) Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Identify the burst activities and the merge activities
Reference No:- TGS03081296

Now Priced at $45 (50% Discount)

Recommended (94%)

Rated (4.6/5)