How much revenue recognize at the time conveyer is installed


Multiple-deliverable arrangements under IFRS

Response to the following :

Assume the same facts as in problem 1, but that Richardson Systems reports under IFRS. How would your answers change? (Assume for requirement 2 that separate shipment is part of the normal course of Richardson's operations, and successful customer installation is highly probable.)

Problem. 1:

Richardson Systems sells integrated bottling manufacturing systems that involve a conveyer, a labeler, a filler, and a capper. All of this equipment is sold separately by other vendors, and the fair values of the separate equipment are as follows:

Conveyer

$20,000

Labeler

10,000

Finer

15,000

Capper

5,000

Total 
              $50,000

Richardson sells the integrated system for $45,000. Each of the components is shipped separately to the customer for the customer to install.

Required:

1. Assume that each of the components can be used independently, even though Richardson sells them as an integrated system. How much revenue should be allocated to each component?

2. Now assume that the labeler, filler, and capper can't be used in production without the conveyer, and that the conveyer is the last component installed. How much revenue should be recognized at the time the conveyer is installed?

Request for Solution File

Ask an Expert for Answer!!
Cost Accounting: How much revenue recognize at the time conveyer is installed
Reference No:- TGS02092179

Expected delivery within 24 Hours