Financial implications associated with two projects


Problem 1: Brutus can purchase equipment on sale for $4,300. The asset has a three year life and will produce a cash flow of $1200 in each of the first and second years, and $3000 in the third year. The interest rate is 12 percent.

A) Calculate the payback period.

B) Calculate the IRR. Should the project be taken?

C) Compute the project’s NPV.

Problem 2: Consider two mutually exclusive R&D projects that XYZ, a chip manufacturer, is considering.  Assume the corporate discount rate is 15 percent and the minimum acceptable IRR is 25 percent.

Project A: Server CPU 0.13 micron processing project. By shrinking the die size to 0.13 micron, XYZ will be able to offer server CPU chips with lower power consumption and heat generation, meaning faster CPUs.

Project B: New telecom chip project. Entry into this industry will require introduction of a new chip for cell phones.  The know-how will require large upfront capital, but success of the project will lead to larger cash flows later on.

Year                A            B
0                -$100,000        -$200,000
1                     50,000              60,000
2                     50,000              60,000
3                     40,000              60,000
4                     30,000            100,000
 5                    20,000            200,000
SUM              $ 90,000          $ 280,000

a. Calculate the NPV, IRR, incremental IRR, and PI for both projects.

b. Discuss the financial implications associated with these two projects.

Solution Preview :

Prepared by a verified Expert
Finance Basics: Financial implications associated with two projects
Reference No:- TGS01814260

Now Priced at $25 (50% Discount)

Recommended (98%)

Rated (4.3/5)